Electromechanical drilling of a 300 m core in a dry hole at Summit, Greenland

Schwander, Jakob; Rufli, Heinrich (1994). Electromechanical drilling of a 300 m core in a dry hole at Summit, Greenland. Memoirs of National Institute of Polar Research. Special Issue, 49, pp. 93-98. National Institute of Polar Research

[img]
Preview
Text
KJ00000012766.pdf - Published Version
Available under License Creative Commons: Attribution (CC-BY).

Download (500kB) | Preview

During the EUROCORE project in 1989 at Summit, Central Greenland, a 304.8-m long ice core of 105mm diameter was retrieved with an electromechanical drill. A dry drilling technique was used in order to minimise contamination of the ice. A special drill head with a small chipping depth was designed to assure minimal fracturing of the core. The quality was excellent to the depth of 180m, but then deteriorated due to increasing brittleness of the ice. Down to 280m we were able to maintain the mean length of unbroken core pieces above 0.1m by reducing the pitch from 7 to 2mm. The sticking of the consequently finer chips to the drill barrels was reduced by treating the barrels repeatedly with a silicone-based wax solution. Hole enlargement cutters near the upper end of the drill head prevented the drill from becoming stuck due to borehole closure.

Item Type:

Conference or Workshop Item (Paper)

Division/Institute:

08 Faculty of Science > Physics Institute > Climate and Environmental Physics

UniBE Contributor:

Schwander, Jakob, Rufli, Heinrich

Subjects:

500 Science > 530 Physics

ISSN:

0386-0744

Publisher:

National Institute of Polar Research

Language:

English

Submitter:

BORIS Import 2

Date Deposited:

28 Jul 2022 16:07

Last Modified:

05 Dec 2022 15:54

Related URLs:

BORIS DOI:

10.48350/161172

URI:

https://boris.unibe.ch/id/eprint/161172

Actions (login required)

Edit item Edit item
Provide Feedback