Schwindt, Christoph

Up a level
Export as [feed] RSS
Group by: Item Type | No Grouping
Number of items: 28.

Journal Article

Trautmann, Norbert; Schwindt, Christoph (2009). A cyclic approach to large-scale short-term planning in chemical batch production. Journal of scheduling, 12(6), pp. 595-606. Norwell, Mass.: Springer US; http://www.springer-ny.com 10.1007/s10951-009-0107-y

Schwindt, Christoph; Trautmann, Norbert; Fink, Rafael (2008). Hierarchische Anlagenbelegungsplanung bei Chargenproduktion. PPS Management - Zeitschrift für Produktionsplanung und -steuerung, 13(2), pp. 35-38. Berlin: GITO-Verlag

Neumann, Klaus; Schwindt, Christoph; Trautmann, Norbert (2005). Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European journal of operational research, 165(2), pp. 495-509. Elsevier 10.1016/j.ejor.2004.04.018

Mellentien, Christoph; Schwindt, Christoph; Trautmann, Norbert (2004). Scheduling the factory pick-up of new cars. OR Spectrum, 26(4), pp. 579-601. Springer 10.1007/s00291-004-0174-6

Schwindt, Christoph; Trautmann, Norbert (2003). Scheduling the production of rolling ingots: Industrial context, model, and solution method. International Transactions in Operational Research, 10(6), pp. 547-563. Blackwell 10.1111/1475-3995.00427

Neumann, Klaus; Schwindt, Christoph; Trautmann, Norbert (2002). Advanced production scheduling for batch plants in process industries. OR Spectrum, 24(3), pp. 251-279. Springer 10.1007/s00291-002-0100-8

Schwindt, Christoph; Trautmann, Norbert (2000). Batch scheduling in process industries: an application of resource-constrained project scheduling. OR Spektrum, 22(4), pp. 501-524. Springer 10.1007/s002910000042

Book Section

Baumann, Philipp; Trautmann, Norbert (2015). Resource-Constrained Project Scheduling with Project Management Information Systems. In: Schwindt, Christoph; Zimmermann, Jürgen (eds.) Handbook on Project Management and Scheduling. International Handbooks on Information Systems: Vol. 2 (pp. 1385-1400). Springer International Publishing 10.1007/978-3-319-05915-0_32

Baumann, Philipp; Fündeling, Cord-Ulrich; Trautmann, Norbert (2015). The Resource-Constrained Project Scheduling Problem with Work-Content Constraints. In: Schwindt, Christoph; Zimmermann, Jürgen (eds.) Handbook on Project Management and Scheduling. International Handbooks on Information Systems: Vol. 1 (pp. 533-544). Cham: Springer International Publishing 10.1007/978-3-319-05443-8_24

Schwindt, Christoph; Trautmann, Norbert (2008). Rolling ingots production scheduling. In: Artigues, C.; Demassey, S.; Néron, E. (eds.) Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (pp. 257-266). London: ISTE Publishing Company

Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (2006). Overview of Klaus Neumann's Research. In: Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) Perspectives on Operations Research. Essays in honor of Klaus Neumann. Gabler Edition Wissenschaft (pp. 1-13). Wiesbaden: DUV

Schwindt, Christoph; Trautmann, Norbert (2006). A cyclic approach to large-scale short-term planning of multipurpose batch plants. In: Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) Perspectives on operations research. Essays in honor of Klaus Neumann (pp. 225-237). Wiesbaden: DUV

Book

Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) (2006). Perspectives on Operations Research. Gabler Edition Wissenschaft. Wiesbaden: DUV

Conference or Workshop Item

Trautmann, Norbert; Schwindt, Christoph; Mellentien, Christoph (2009). Ablaufplanung von Eventmarketing-Veranstaltungen in der Automobilindustrie am Beispiel der Werksabholung von Neuwagen. Wintertagung der Wissenschaftlichen Kommission Operations Research des Vereins der Hochschullehrer für Betriebswirtschaftslehre, Ingolstadt, 23.-24. Januar.

Trautmann, Norbert; Fink, Rafael; Sagebiel, Hanno; Schwindt, Christoph (2008). A decomposition approach to short-term scheduling of multi-purpose batch processes. In: Braunschweig, Bertrand; Joulia, Xavier (eds.) 18th European Symposium on Computer Aided Process Engineering. Computer-Aided Chemical Engineering: Vol. 25 (pp. 157-162). Amsterdam: Elsevier

Trautmann, Norbert; Fink, Rafael; Sagebiel, Hanno; Schwindt, Christoph (2007). A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units. In: Helander, Martin; Xie, Min; Jiao, Roger; Tan, Kay Chuan (eds.) Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2.-4.12.2007 (pp. 1342-1346). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/IEEM.2007.4419411

Schwindt, Christoph; Fink, Rafael; Trautmann, Norbert (2007). A priority-rule based method for scheduling in chemical batch production. In: Helander, Martin; Xie, Min; Jiao, Roger; Tan, Kay Chuan (eds.) Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2.-4.12.2007 (pp. 1347-1351). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/IEEM.2007.4419412

Trautmann, Norbert; Schwindt, Christoph (2007). Large-scale short-term planning in chemical batch production. In: Baptiste, Philippe; Kendall, Graham; Munier-Kordon, Alix; Sourd, Francis (eds.) Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Paris, 28.-31.8.2007 (pp. 490-497). Multidisciplinary Interernational Scheduling Conference. Theory & Application

Trautmann, Norbert; Herrmann, Sascha; Schwindt, Christoph (2006). Planning and scheduling of multipurpose continuous plants. In: Marquardt, Wolfgang; Pantelides, Costas (eds.) 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, Garmisch-Partenkirchen (D), 9.-13.7.2006. Computer Aided Chemical Engineering: Vol. 21A (pp. 2159-2164). Amsterdam: Elsevier

Trautmann, Norbert; Schwindt, Christoph (2006). Priority-rule based scheduling of chemical batch processes. In: Marquardt, Wolfgang; Pantelides, Costas (eds.) 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, Garmisch-Partenkirchen (D), 9.-13.7.2006. Computer Aided Chemical Engineering (pp. 2165-2170). Amsterdam: Elsevier

Trautmann, Norbert; Schwindt, Christoph (2006). A heuristic method for large-scale batch scheduling in the process industries. In: Haasis, Hans-Dietrich; Kopfer, Herbert; Schönberger, Jörn (eds.) Operations research proceedings 2005. Selected papers of the annual International Conference of the German Operations Research Society (GOR), Bremen, September 7-9, 2005 (pp. 155-160). Heidelberg: Springer Verlag

Trautmann, Norbert; Herrmann, Sascha; Schwindt, Christoph (2006). A heuristic decomposition method for the short-term planning of continuous plants. In: Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, 26.-28.4.2006 (pp. 313-318). Pozna: Institute of Computing Science, Pozna University of Technology

Trautmann, Norbert; Schwindt, Christoph (2005). A MINLP/RCPSP decomposition approach for the short-term planning of batch production. Computer Aided Chemical Engineering, 20, pp. 1309-1314. Amsterdam: Elsevier 10.1016/S1570-7946(05)80060-4

Schwindt, Christoph; Trautmann, Norbert (2004). A priority-rule based method for batch production scheduling in the process industries. In: Ahr, D.; Fahrion, R.; Oswald, M.; Reinelt, G. (eds.) Operations Research Proceedings 2003 (pp. 111-118). Springer

Schwindt, Christoph; Trautmann, Norbert (2003). Scheduling of rolling ingots production. In: Leopold-Wildburger, Ulrike; Rendl, Franz; Wascher, Gerhard (eds.) Operations Research Proceedings 2002 (pp. 83-88). Springer

Schwindt, Christoph; Trautmann, Norbert (2002). Scheduling continuous material flows. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal. 03.-05.07.2002.

Schwindt, Christoph; Trautmann, Norbert (2002). Storage problems in batch scheduling. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (eds.) Operations Research Proceedings 2001 (pp. 213-218). Berlin: Springer

Trautmann, Norbert; Schwindt, Christoph (2002). Storage problems in process scheduling. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal. 03.-05.07.2002.

This list was generated on Thu Apr 25 13:11:25 2024 CEST.
Provide Feedback