0000-0001-6010-5945

Up a level
Export as [feed] RSS
Group by: Date | Item Type | Refereed | No Grouping
Jump to: No | Yes

No

Rihm, Tom (6 July 2016). A matheuristic for short-term planning of assessment centers (Unpublished). In: 28th European Conference on Operational Research. Poznan. 03.-06. Juli 2016.

Rihm, Tom (September 2014). An MILP-based heuristic for the capital-constrained net present value problem (Unpublished). In: International Conference on Operations Research 2014. Aachen. 02.-05.09.2014.

Yes

Gnägi, Mario; Rihm, Tom; Zimmermann, Adrian; Trautmann, Norbert (2019). Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem. Computers & industrial engineering, 129, pp. 346-353. Elsevier 10.1016/j.cie.2019.01.033

Gnägi, Mario; Rihm, Tom; Trautmann, Norbert (17 December 2018). A continuous-time MILP formulation for the multi-mode resource-constrained project scheduling problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.

Trautmann, Norbert; Rihm, Tom; Saner, Nadine Josephine; Zimmermann, Adrian (17 April 2018). A continuous-time assignment-based MILP formulation for the resource-constrained project scheduling problem. Proceedings of the 16th International Conference on Project Management and Scheduling, pp. 242-245.

Rihm, Tom; Trautmann, Norbert; Zimmermann, Adrian (2018). MIP formulations for an application of project scheduling in human resource management. Flexible Services and Manufacturing Journal, 30(4), pp. 609-639. Springer 10.1007/s10696-016-9260-8

Rihm, Tom; Baumann, Philipp (2018). Staff assignment with lexicographically ordered acceptance levels. Journal of scheduling, 21(2), pp. 167-189. Springer 10.1007/s10951-017-0525-1

Rihm, Tom; Trautmann, Norbert (10 December 2017). An assignment-based continuous-time MILP model for the resource-constrained project scheduling problem. In: Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 10.-13.12.2017. 10.1109/IEEM.2017.8289846

Rihm, Tom (29 June 2017). A mathematical programming approach for computing the pathwidth of graphs (Unpublished). In: 15th Swiss Operations Research Days. Fribourg. 29.-30.06.2017.

Rihm, Tom (23 June 2017). Minimizing operational costs of assessment centers (Unpublished). In: International Symposium on Scheduling 2017. Nagoya, Japan. 23.-25.06.2017.

Rihm, Tom; Trautmann, Norbert (23 June 2017). An assignment- and sequencing-based mixed-integer linear programming formulation for the resource-constrained project scheduling problem. In: Proceedings of the International Symposium on Scheduling 2017. Nagoya, Japan. 23.-25.06.2017.

Rihm, Tom (23 June 2017). Minimizing operational costs of assessment centers. In: International Symposium on Scheduling. Proceedings. Nagoya, Japan. 23.-25.06.2017.

Rihm, Tom (May 2017). A Greedy Heuristic for Artisan Ice Cream Production Scheduling (Unpublished). In: 28th Annual POMS Conference. Seattle. 05.-08.05.2017.

Rihm, Tom; Trautmann, Norbert (2017). A decomposition heuristic for short-term planning of assessment centres. European journal of industrial engineering, 11(6), pp. 725-751. Inderscience Publishers 10.1504/EJIE.2017.10006711

Rihm, Tom (November 2016). Facets and valid inequalities for the pathwidth problem. In: INFORMS Annual Meeting. Nashville. 13.-16.11.2016.

Rihm, Tom (September 2016). Operational planning of assessment centers: Matheuristic and performance analysis (Unpublished). In: 14th Swiss Operations Research Days. Lugano. 08.-09.09.2016.

Rihm, Tom (May 2016). Planning assessment centers: An MIP-based decomposition heuristic (Unpublished). In: 27th Annual POMS Conference. Orlando. 06.-09.05.2016.

Rihm, Tom (April 2016). A decomposition heuristic for an assessment center planning problem (Unpublished). In: 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04.2016.

Rihm, Tom; Trautmann, Norbert (2016). A decomposition heuristic for an assessment center planning problem (Unpublished). In: Proceedings of the 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04. 2016.

Rihm, Tom; Baumann, Philipp (December 2015). Improving Fairness in Staff Assignment: An Approach for Lexicographic Goal Programming. Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 1247-1251. Singapore: IEEE 10.1109/IEEM.2015.7385847

Rihm, Tom (December 2015). Improving Fairness in Staff Assignment: An Approach for Lexicographic Goal Programming (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.-09.12.2015.

Rihm, Tom (September 2015). An MILP-based heuristic for staff scheduling problems with acceptance levels (Unpublished). In: International Conference on Operations Research. Vienna. 01.-04.09.2015.

Rihm, Tom (August 2015). A lexicographic goal programming approach for staff assignment with acceptance levels (Unpublished). In: Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague. 25.-28.08.2015.

Rihm, Tom (January 2015). An integer goal programming approach for a real-world employee scheduling problem (Unpublished). In: Programme Doctoral en Recherche Opérationnelle. Zinal. 11.-15.01.2015.

Rihm, Tom; Baumann, Philipp (2015). A lexicographic goal programming approach for staff assignment with acceptance levels. In: Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague.

Rihm, Tom; Trautmann, Norbert (2014). A MIP-based decomposition heuristic for resource-constrained project scheduling. In: Fliedner, Thomas; Kolisch, Rainer; Naber, Anulark (eds.) Proceedings of the 14th International Conference on Project Management and Scheduling (pp. 193-196). TUM School of Management

Rihm, Tom (2014). A MIP-based decomposition heuristic for resource-constrained project scheduling (Unpublished). In: 14th International Conference on Project Management and Scheduling. München. 30.03.-02.04 2014.

Provide Feedback