Gnägi, Mario; Rihm, Tom; Trautmann, Norbert (17 December 2018). A continuous-time MILP formulation for the multi-mode resource-constrained project scheduling problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.
Text
multi mode.pdf - Published Version Restricted to registered users only Available under License Publisher holds Copyright. Download (249kB) |
The well-known multi-mode resource-constrained project scheduling problem aims at selecting for each project task a start time and an execution mode to obtain a precedence and resource-feasible schedule with minimal project duration. The available execution
modes for the tasks differ in their durations and demands for some scarce resources. Numerous problem-specific solution methods and several mixed-integer linear programming (MILP) formulations have been described in the literature. We introduce a new continuous-time MILP formulation that employs continuous start-time variables and
three types of binary variables: mode-selection, resource-assignment and sequencing variables. The results of our computational analysis indicate that the proposed formulation achieves superior performance than two formulations from the literature when the
range of the tasks’ durations is relatively high.
Item Type: |
Conference or Workshop Item (Paper) |
---|---|
Division/Institute: |
03 Faculty of Business, Economics and Social Sciences > Department of Business Management > Institute of Financial Management > Professorship for Quantitative Methods in Business Administration |
UniBE Contributor: |
Gnägi, Mario, Rihm, Tom, Trautmann, Norbert |
Subjects: |
600 Technology > 650 Management & public relations |
Language: |
English |
Submitter: |
Juliana Kathrin Moser-Zurbrügg |
Date Deposited: |
22 Jan 2019 11:54 |
Last Modified: |
05 Dec 2022 15:24 |
BORIS DOI: |
10.7892/boris.123483 |
URI: |
https://boris.unibe.ch/id/eprint/123483 |