Zimmermann, Adrian

Up a level
Export as [feed] RSS
Group by: Date | Item Type | Refereed | No Grouping
Jump to: Yes

Yes

Gnägi, Mario; Rihm, Tom; Zimmermann, Adrian; Trautmann, Norbert (2019). Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem. Computers & industrial engineering, 129, pp. 346-353. Elsevier 10.1016/j.cie.2019.01.033

Gnägi, Mario; Zimmermann, Adrian; Trautmann, Norbert (19 December 2018). A continuous-time unit-based MILP formulation for the resource-constrained project scheduling problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.

Trautmann, Norbert; Rihm, Tom; Saner, Nadine Josephine; Zimmermann, Adrian (17 April 2018). A continuous-time assignment-based MILP formulation for the resource-constrained project scheduling problem. Proceedings of the 16th International Conference on Project Management and Scheduling, pp. 242-245.

Rihm, Tom; Trautmann, Norbert; Zimmermann, Adrian (2018). MIP formulations for an application of project scheduling in human resource management. Flexible Services and Manufacturing Journal, 30(4), pp. 609-639. Springer 10.1007/s10696-016-9260-8

Zimmermann, Adrian; Trautmann, Norbert (2018). A list-scheduling heuristic for the short-term planning of assessment centers. Journal of scheduling, 21(2), pp. 131-142. Springer US; http://www.springer-ny.com 10.1007/s10951-017-0521-5

Zimmermann, Adrian (2017). A mixed-integer programming-based heuristic for project scheduling with work-content constraints. European journal of industrial engineering, 11(6), pp. 752-773. Inderscience Publishers 10.1504/EJIE.2017.10006712

Zimmermann, Adrian (December 2016). An MIP-based heuristic for scheduling projects with work-content constraints (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Bali. 04.12.-07.12.2016.

Zimmermann, Adrian (September 2016). An MIP-based heuristic for scheduling projects with work-content constraints (Unpublished). In: 14th Swiss Operations Research Days. Lugano. 08.-09.09.2016.

Zimmermann, Adrian (2016). An MIP-based heuristic for scheduling projects with work-content constraints. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 1195-1199). IEEE 10.1109/IEEM.2016.7798067

Zimmermann, Adrian (September 2015). Efficient list-generation techniques for scheduling assessment centers (Unpublished). In: International Conference on Operations Research. Vienna. 01.-04.09.2015.

Zimmermann, Adrian; Trautmann, Norbert (August 2015). A list-scheduling approach for the planning of assessment centers. Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications, pp. 541-554.

Zimmermann, Adrian (August 2015). A list-scheduling approach for the planning of assessment centers (Unpublished). In: Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague. 25.-28.08.2015.

Zimmermann, Adrian (May 2015). A heuristic approach for scheduling assessment centers (Unpublished). In: 13th Swiss Operations Research Days. 07.-08.05.2015. Zurich.

Zimmermann, Adrian (January 2014). Operational planning of assessment centers (Unpublished). In: Programme Doctoral en Recherche Opérationelle. Zinal. 12.-16.01.2014.

Zimmermann, Adrian; Trautmann, Norbert (2014). Scheduling of assessment centers: an application of resource-constrained project scheduling. In: Fliedner, Thomas; Kolisch, Rainer; Naber, Anulark (eds.) Proceedings of the 14th International Conference on Project Management and Scheduling (pp. 263-266). TUM School of Management

Grüter, Joëlle Nathalie; Trautmann, Norbert; Zimmermann, Adrian (2014). An MBLP model for scheduling assessment centers. In: Huisman, Dennis; Louwerse, Ilse; Wagelmans, Albert P.M. (eds.) Operations Research Proceedings 2013 (pp. 161-167). Cham: Springer International Publishing 10.1007/978-3-319-07001-8_22

Zimmermann, Adrian (2014). Scheduling of assessment centers: an application of resource-constrained project scheduling (Unpublished). In: 14th International Conference on Project Management and Scheduling. München. 30.03.-02.04.2014.

Zimmermann, Adrian (2013). An MBLP model for scheduling assessment centers. In: International Conference Operations Research 2013. Rotterdam. 03.09.-06.09.2013.

Provide Feedback