Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient.

We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods.

Item Type:

Journal Article (Original Article)

Division/Institute:

03 Faculty of Business, Economics and Social Sciences > Department of Business Management > Institute of Financial Management > Professorship for Quantitative Methods in Business Administration

UniBE Contributor:

Baumann, Philipp, Trautmann, Norbert

Subjects:

600 Technology > 650 Management & public relations

ISSN:

0377-2217

Publisher:

Elsevier

Language:

English

Submitter:

Juliana Kathrin Moser-Zurbrügg

Date Deposited:

11 Sep 2014 16:00

Last Modified:

05 Dec 2022 14:34

Publisher DOI:

10.1016/j.ejor.2013.12.040

BORIS DOI:

10.7892/boris.53020

URI:

https://boris.unibe.ch/id/eprint/53020

Actions (login required)

Edit item Edit item
Provide Feedback